Technical information Crab range

A s s e m b l i n g a n d d i s m a n t l i n g u s i n g MD S g u a r d r a i l 1 8 • From the lower level, fit the MDS guardrails in the stirrups. Detailed kinematics on next page. • Fit the missing ledgers at 2.00 m, by inserting them into the bottom supports of the MDS guardrail. The guardrail is now locked in place. • Fit the longitudinal diagonals. • Fit the “No entry” sign. • From the lower level, lay the deck in all the grid sections of the upper level. • Place and lay the adjustable baseplate on the spacing shims. • Interlock the basic standards. • Fit the ledgers. • Level up. • Instal the first platform to facilitate erection. • Complete the platform inside the grid. • Fit the 3.00 m standard. • Fit the ledgers at 2.00 m that do not need MDS guardrails. • Fitting the toeboards. • Fit the 2.00 m standard. • Continue assembling, following the previous steps (3 to 8). • Place the third ledger in the access section. • Secure the stucture with ties as erection progresses. 1 2 3 4 5 6 7 8 9 The MDS guardrail is used for both erection and normal use. It is fitted from the level below by 1 erector to provide collective protection for the level above. The scaffolding thus equipped is rated “MDS category 2” according to INRS criteria (MDS = Montage Démontage Sécurité, Assembly Dismantling Safety). 01.11.17 T e c h n i c a l i n f o r m a t i o n

RkJQdWJsaXNoZXIy OTQ2MzM=