Technical information Crab range

C r a b é t a i : A s s emb l i n g a n d d i s ma n t l i n g s h o r i n g i n v o l ume Erection • Fit the diagonal braces on every other section. • From the bottom, lay the deck in its entirety. • For a higher volume: Continue assembling, following steps 2 to 5 with 2.00 m standards), Remember the 3rd guardrail rail perpendicular to the ladder, Check stability according to the height/width ratio of the tower. • Place and lay the adjustable baseplate on the spacing shims. • Interlock the basic standards and fit the ledgers. • Level. • Fit the temporary decks. • Assemble the complete deck in the access section. • Fit the 3.00 m standards. • Fit the MDS guardrails and lock them using ledgers (see detailed kinematics on page 19). Reinforced or normal ledgers. 1 2 3 4 5 6 • Fit and adjust the slides. • Fir the adjustable diagonal braces and ledgers. • Fit and adjust the fork heads. • Inspect the tower and draft the acceptance report. Dismantling: dismantle the tower in the reverse order of assembly. If assembling with MDS guardrails, lay a deck every 2.00 m. 143 01.11.17 T e c h n i c a l i n f o r m a t i o n

RkJQdWJsaXNoZXIy OTQ2MzM=