Technical information Crab range
Touréchaf : Assembl ing and dismant l ing a 1.50 x 1.50 m tower • Erect the base and level it. • From the inside of the tower, fit the first frame diagonally and swivel to lock it. • Fit the access frame for easy access. 1 2 3 • Lay 2 decks with trapdoor and assemble the second level. Raise the access decks to their final position so that there is a height of 2.00 m between decks. Fit a temporary deck. • Lay a first access deck. • Move up to the next level and fit the second access deck. • Assemble the third level. 4 5 6 7 • Move the first deck with hatch. • Move the second deck with hatch from the lower level. • Dismantle the first deck level. • The upper level can be accessed using the integral ladder. • Fit and adjust the fork heads. 10 11 8 9 Access Dismantling: dismantle the tower in the reverse order of assembly. Requirements > Ensure that the load is evenly distributed on the ground. > Ensure that the base is levelled. > Fit the first level frames from inside the tower. > Fit the access hatch opposite the ladder. > Ensure that the tower is stable. > Centre the load in the forks. 108 01.11.17 T e c h n i c a l i n f o r m a t i o n
Made with FlippingBook
RkJQdWJsaXNoZXIy OTQ2MzM=