261 FALSEWORK - TECHNICAL INFORMATION - 2023 FALSEWORK 8 •The structure must be braced using a ledger and a diagonal brace. •The first-level deck can be removed. •The upper level can be accessed using the access ladder. 10 •Move the fourth deck with trapdoor from the lower level. 9 11 •Fit and adjust the fork heads. The structure must be braced using a ledger and a diagonal brace. •Complete the assembly and adjust the 2 screw-jack fork heads. Raise the decks with trapdoor to their final position so that there is a height of 2.00 m between decks. Dismantle in the reverse order of assembly. DISMANTLING Rules for laying out falsework of 6-leg towers: - on the periphery and on the first level: 2 access frames, preferably 1.50 m, - inside and on all levels: 1 diagonal brace and 1 ledger. Frame Access frame Ledger Diagonal brace Ledger for Wind bracing Diagonal brace for Wind bracing 0.20 m PANACIER Deck with trapdoor The central side must be wind-braced with diagonal braces and ledgers on all levels. ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce Tours 9 poteaux Tours 6 poteaux ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce ce 1.00 1.00 1.00 1.00 1.50 1.50 1.50 1.50 See the assembly recommendations presented at the beginning of this technical information.
RkJQdWJsaXNoZXIy OTQ2MzM=