Previous Page  4 / 15 Next Page
Information
Show Menu
Previous Page 4 / 15 Next Page
Page Background

See our updates at

entrepose - echafaudages.fr

product advantages

4

CRABESCAL

SITE STAIRWAYS

The CrabEscal site stairway is designed to use

standard MultiCrab scaffolding components and is

extremely flexible in use.

CrabEscal can be incorporated in the scaffolding or

built in a separate tower.

CrabEscal can be assembled from the ground or

suspended.

These can be built in a number of different ways: continuous, alter-

nating or with a return landing between flights. Protection on the

exposed side is provided by 2 or 3 diagonal braces, serving as

handrails.

All frontal and side exits are possible.

the flights

Side exits

Platform stairway

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

ENTREPOSE

Continuous flights

Exit every 2 m.

frontal exit

Side exit

Alternative flights

Right / left exit every 4 m.

Return landing between flights

Exit on the same side every 2 m.