Technical information Crab range

ACCESS STAIRCASES - TECHNICAL INFORMATION - 2023 164 ACCESS TOWER WITH PANATRAP ASSEMBLY INSTRUCTIONS - OVERHAND WITH COMPRESSIVE DIAGONAL BRACES •Place and lay the adjustable baseplates on the distribution wedges. •Interlock the basic standards. •Fit the ledgers. •Level. 1 2 •Lay the first deck. •Fit the 3.00 m uprights. 3 •From the lower level, fit the SAD guardrails in the stirrups. •Fit the missing ledgers at 2.00 m, by inserting them into the bottom supports of the SAD guardrail. The guardrail is now locked in place. •Fit the initial anchor points at 2.00 m on the inner standards then the next ones spaced vertically every 4.00 m. •Fit the longitudinal diagonal and cross braces. •Fit the “No entry” sign. •Fit the Panatrap to access the upper level. 4 5 •Fit the toe boards. •Fit the 2.00 m uprights. •Fit guardrail lateral protection ledgers on the outside at +1.5 m from the deck. 6 •Fit the missing ledgers with locking pin of the SAD guardrails and the longitudinal diagonal on the outside. •Continue the assembly following steps 4 to 6. •Inspect the structure and put the inspection report in the pocket on the “no entry” sign. Dismantling is to be done in the reverse order of assembly. INFO See the assembly recommendations presented at the beginning of this technical information.

RkJQdWJsaXNoZXIy OTQ2MzM=